St David’s Centre, Holloway, London
First as project architect when employed full-time, then as free-lance architect for Matthew Lloyd Architects LLP
- Context: de-consecrated and disused space in poor state of repair.
- Involvement: from design development to planning and building control submissions.
- Role: specification writing, detail design, fire escape strategy, liaison with client, Building Control and consultants.
- Construction period: August 2012 - 2013.
- Contract: JCT, Intermediate Form.
- Construction cost: £ 2.5m